Agilent Cary 3500 UV-Vis Systems Site Preparation Checklist

Manuals | 2020 | Agilent TechnologiesInstrumentation
UV–VIS spectrophotometry
Industries
Manufacturer
Agilent Technologies

Summary

Importance of the Topic


Proper site preparation is critical for ensuring that high-performance UV-Vis spectrometers like the Agilent Cary 3500 operate reliably over their service life. By addressing laboratory layout, environmental stability, utility provisioning, and safety considerations in advance, organizations can minimize installation delays, reduce downtime, and maintain consistent analytical performance.

Study Objectives and Overview


This whitepaper serves as a comprehensive checklist for customers preparing to receive and install the Agilent Cary 3500 UV-Vis system. It defines space requirements, environmental conditions, power and gas utilities, and required operating supplies. The goal is to facilitate a smooth installation, proper instrument commissioning, and user familiarization.

Methodology and Instrumentation


The document details responsibilities divided between the customer and Agilent service teams. Key instrumentation aspects covered include:
  • Agilent Cary 3500 UV-Vis Engine and optional modules (compact, multicell or Peltier‐controlled), including network setup via DHCP/Zeroconf or static IP.
  • Physical layout considerations: bench dimensions, weight limits, airflow clearances (20 cm sides, 10 cm rear for Peltier models; 10 cm all around for non-Peltier).
  • Environmental controls: recommended ambient temperature 20–25 °C ±2 °C, humidity 15–80% non-condensing, clean air free of dust, acid and organic vapors.
  • Utility requirements: single-phase AC power (100–240 VAC, 50/60 Hz) with dedicated grounded outlet; compressed dry gas supply (nitrogen or filtered air) for Peltier purge at specified flow rates.
  • Required consumables: quartz cuvettes, lens cleaning materials, temperature probes and purge kits.

Key Results and Discussion


The checklist translates into practical site requirements that support successful instrument operation:
  • Bench space dimensions and weight capacities are tabulated for each engine and module configuration.
  • Airflow and clearance specifications guarantee adequate cooling and prevent condensation in temperature-controlled modules.
  • Power consumption metrics (70–450 W) inform electrical planning, while cable inventories ensure compatibility with regional standards.
  • Environmental guidelines mitigate performance drift caused by temperature fluctuations, dust accumulation, or corrosive vapors.
  • Compressed gas purge specifications prevent moisture ingress when operating below ambient temperatures.

Benefits and Practical Applications


Adhering to these site preparation guidelines ensures rapid instrument deployment, consistent spectral performance, and reduced maintenance interventions. Laboratories benefit from predictable installation timelines and optimal uptime for applications in research, quality control, and industrial analysis.

Future Trends and Applications


Emerging developments may include integration with IoT-enabled environmental monitoring, predictive maintenance alerts based on real-time sensor data, and automated calibration routines. Remote diagnostics and cloud-based performance tracking could further streamline instrument lifecycle management.

Conclusion


Thorough site preparation is foundational to the reliable operation of the Agilent Cary 3500 UV-Vis system. By following the detailed checklist for space, environment, utilities, and supplies, users can achieve smooth installations, maintain high analytical accuracy, and extend instrument longevity.

References


  • Agilent Technologies. Site Preparation Checklist for Cary 3500 UV-Vis Systems. Document D0004006, Revision A.00, July 1, 2020.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Agilent Cary 3500 UV-Vis - System Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent Cary 3500 UV-Vis System Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full…
Key words
description, descriptionpower, powercord, cordspecial, specialoperating, operatingrequirements, requirementsinstrument, instrumentweight, weightvis, visservice, servicecustomer, customersite, sitelbs, lbspeltier, peltierpart
G9853A Agilent Cary Sipper Site Preparation Checklist
G9853A Agilent Cary Sipper Site Preparation Checklist Thank you for purchasing an Agilent accessory. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the…
Key words
sipper, sippercary, carychecklist, checklistaccessory, accessorysite, sitepower, powerdescription, descriptionoperating, operatingagilent, agilentspecial, specialpreparation, preparationcustomer, customerconsumption, consumptionweight, weightnotes
Agilent Cary Sipper Accessory Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent Cary Sipper Accessory Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full value…
Key words
sipper, sippercary, caryaccessory, accessorysite, sitechecklist, checklistagilent, agilentpower, powerdescription, descriptionpreparation, preparationspecial, specialoperating, operatingweight, weightservice, servicerequirements, requirementscustomer
Agilent Vaya Raman (G6915A) Site Preparation Checklist
Agilent Vaya Raman (G6915A) Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the…
Key words
site, sitechecklist, checklistpage, pagevaya, vayacustomer, customerspecial, specialpower, powerpreparation, preparationcord, cordoperating, operatingnotes, notesraman, ramandescription, descriptionyour, yourinstrument
Other projects
GCMS
LCMS
Follow us
FacebookLinkedInYouTube
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike